Skip to content

One team, one system, from slab to keys

Turnkey light steel frame construction, design and build, financing coordination and large-scale partnerships.

Galvanised steel wall framing on a slab.

What we build, and how we help you pay for it

  • Turnkey housing

    One team from concept to key handover: design, financing coordination, construction and finishes, managed as a single scope.

  • Light steel frame construction

    Engineered cold-formed steel walls, trusses and floors, assembled to approved drawings with a continuous load path from roof to slab.

  • Financing coordination

    We work with funding partners to line up a payment pathway alongside your specification and cost plan, including for clients outside standard mortgage access.

  • Design and build

    Our planners turn your brief into a buildable design: use, site, spaces, appearance and budget, all agreed before anything is manufactured.

  • Public and private partnerships

    Large-scale developments with government agencies, employers and private developers, aimed at communities the housing market has left out.

  • Have a plot, a plan or just an idea?

From bare site to keys in hand

Turnkey means one team carries the whole job. Here is what that looks like on site.

  1. 1

    Planning and groundworks

    Project scope, design coordination, approvals, site preparation and foundation works.

  2. 2

    Steel frame construction

    Engineered wall framing, roof trusses and floor framing are set out, anchored and braced.

  3. 3

    Roofing, walls and floors

    Roof coverings, cladding, insulation, wall linings, ceilings and selected flooring.

  4. 4

    Services and final finishes

    Plumbing and electrical, doors, windows, fixtures, painting, completion checks and handover.

Look inside the walls

Every Sterling's Hammer home is a coordinated system, not a pile of materials. Pick a part of the house and pull it apart.

Wall build-up shown as separate layers Wall build-up shown assembled

Outside to inside

  1. Exterior fibre-cement board
  2. Weather control membrane
  3. Thermal break and insulation
  4. Steel frame with cavity insulation
  5. Interior fibre-cement board

Interior and exterior panels are pre-painted fibre cement, so walls arrive finished.

Illustrative build-up. Final layers follow the approved project drawings.

Why build with light steel frame?

Steel doesn't rot, warp or feed termites, and it goes up with the precision of something made in a factory.

Galvanised steel wall frame standing on a concrete slab.
  • Precision and consistency

    Prepared components assemble accurately, with clean interfaces for walls, roofs and services.

  • Efficient site assembly

    Prefabricated panels and trusses streamline erection on site. Programme depends on scale and access.

  • Material efficiency

    Cut-to-length members reduce offcuts, and steel is recyclable at the end of its life.

  • Flexible finishes

    The same frame carries fibre-cement, metal or timber-look cladding and a range of interiors.

Steel inside. Your choice outside.

The frame doesn't dictate the look. Pre-painted fibre cement comes as standard, with alternatives available where the supplier and engineer approve them.

  • Fibre cement finish sample

    Fibre cement

  • Metal finish sample

    Metal

  • Timber look finish sample

    Timber look

  • Internal board finish sample

    Internal board

One continuous load path, roof to ground

Wind, weight and weather all have to go somewhere. In a steel frame home, every force is traced from the roof sheeting to the soil and checked by an engineer before anything is made.

Section through a steel frame house showing loads travelling from the roof, down the walls and through anchors into the foundation. 1 2 3 Roof loads Uplift Ground reactions
  1. Roof and tie-downs

    Steel trusses gather roof weight and wind uplift, and tie-downs lock them to the walls.

  2. Walls and bracing

    Studs, straps and braced panels pass those forces down without a break in the chain.

  3. Anchors and foundation

    Engineered anchors transfer every reaction into a slab designed for your ground conditions.

Three steel shapes do the heavy lifting

Thin galvanised sheet, cold-formed into purpose-made sections. Grade, thickness and coating are recorded for every member.

Galvanised steel c-sections

C-sections

Lipped channels that form studs, joists and truss members.

Galvanised steel u-tracks

U-tracks

Locate stud ends and tie wall panels together top and bottom.

Galvanised steel support profiles

Support profiles

Secondary sections that carry roofing or cladding where specified.

Warranties measured in generations

A home is the biggest thing most families will ever pay for. The structure under it should outlast the payments, and then some.

  • Nothing for termites to eat

    Galvanised steel framing and the specified fibre-cement boards can't be eaten by termites.

  • Noncombustible framing

    Steel framing doesn't burn. Fire ratings are documented for the complete approved wall or roof assembly.

  • Galvanised against rust

    Hot-dip galvanised members, with the coating chosen for coastal, saline or damp exposure.

Warranty period, years

Light-gauge steel frame
100yrs

Supplier warranty on all framing

Fibre-cement wall panels
50yrs

Pre-painted interior and exterior boards

Supplier-stated warranty coverage, subject to the applicable written terms. Copies are handed over with your home.

Your brief shapes the building

No two plots or families are the same, so every project starts with a specification written around you. Any change is checked against the spec, price and programme before it happens.

  1. 1

    Understand the project

    Define the use, site, scale, spaces, appearance and your priorities.

  2. 2

    Select the construction system

    Coordinate structure, roof, walls, floors, insulation and services.

  3. 3

    Agree finishes and budget

    Confirm materials, specifications, inclusions and the cost plan.

  4. 4

    Plan delivery and handover

    Set procurement, approvals, construction milestones and completion requirements.

Four inspection gates. Nothing skips one.

Work only moves forward once each gate is signed off, and every correction is recorded. You get the paperwork at handover.

  1. Approve

    Before manufacture

    Approved drawings and your sign-off: loads, member and connection schedules, foundation reactions, coatings.

  2. Verify

    Material receipt

    Member IDs, dimensions, base-metal thickness, grade and coating records, correct fasteners, no damage.

  3. Inspect

    Before enclosure

    Alignment, bearing, bracing, connections, anchors, roof tie-downs and service openings, all recorded.

  4. Deliver

    Handover

    As-built information, certificates, inspection records, maintenance instructions and written warranties.

The money plan is built alongside the house plan

Many families are shut out of conventional mortgages. We sit down with you and our funding partners to find a pathway that fits, and run it in step with your specification, cost plan and build programme.

Talk to us about financing
  • Homeownership

    Assess affordability, available finance and an agreed payment structure for your own home.

  • Development projects

    Phased construction and funding aligned with procurement and completion milestones.

  • Partner-led models

    Employer-supported or public-private models, where suitable and available.

Financing is subject to feasibility, eligibility, due diligence, provider approval and agreed contracts. Availability and approval are not guaranteed.